HOW LONG DOES IT TAKE TO BUILD THE PARK?

HOW LONG DOES IT TAKE TO BUILD THE PARK?

From receipt of your order (which must include formal approval of a definitive layout and confirmation of colour choices) to final installation will normally be 3 months.

We manufacture everything in-house in our 100,000 sq ft factory in Huddersfield. We then bring everything to site in our own fleet of HGVs and our in-house team of installation technicians install the system.

The first 4 to 6 weeks of the process is in-house manufacture with installation taking place from 6 weeks onwards until completion.

The raised walkway, or “podium” between the different activities is something that Continental can provide or it can be provided by your fit-out contractor or builder. If the podium is supplied and installed by others, this can reduce Continental’s time on site by typically two weeks.

Categories: Setting up a trampoline park

Downloads